Case Studies
Precision Engineering
Maximized Tax Savings
How our engineering-led cost segregation studies unlock massive liquid capital.

Medical Office Builing
Our analysis successfully isolated high-value clinical components, mechanical infrastructure, and tenant improvements, maximizing immediate tax savings and accelerating cash flow.


Alpine Condo Rental
A comprehensive cost segregation study performed on a newly acquired mountain rental property, identifying significant accelerated depreciation opportunities across land improvements and personal property components.


STR Feasibility Benchmark
Feasibility and engineering-led analysis for a premier Short-Term Rental (STR). Despite projected accelerated depreciation, the strategy was not deployed due to compressed depreciable basis, high land valuation, and indefinite timelines.


Adventure Park Project
This project uncovered $1.4M in qualifying site preparation and land improvements that previously had been overlooked. Reclassifying 38% of the total basis unlocked tremendous, unexpected immediate cash flow for our client.


Assisted Living Facility Cost Segregation Study
How an enterprise freed up an estimated $16,000,000 in accelerated cash flow with CSI's engineering-led cost segregation strategy . You can see a typical project for this client here.
